
Please feel free to download our brochure in PDF format by clicking
the link below.
Download Brochure
MCS
Integrated Control System for Airbus fuel systems test facilityMCS Control Systems were contracted by Airbus as 1st tier supplier to design, build, install and commission a comprehensive system to control aviation-fuel supply and conditioning for testing of fuel behaviour in it's current range of in-service passenger aircraft, development aircraft and future projects.
The process calls for aviation-fuel to be delivered to aircraft test rigs after being optionally heated to +50°C, chilled to -47°C, with vacuum to simulate altitude. The process also supplies the rigs with Nitrogen, Dowtherm and Hydraulics; for dynamic rig movements. The control system can respond to manual commands, or to an imported flight profile to simulate a typical flight plan.
All events, data and fault conditions are monitored, displayed and logged for operators located in the control room, remote from the Zoned plant areas.
MCS are continueing to work with Airbus to enhance facility operations to meet future requirements. The facility was opened by HRH The Duke of York on the 28th of February 2006.
